  1. Dam Authorized by U.S. Congress:        April 11, 1956    
  2. First construction begun:                 October 1, 1956
  3. Colorado River diverted:                 February 11, 1959
  4. First concrete poured:                 June 17, 1960
  5. Last concrete poured:                September 13, 1963    
  6. Height above bedrock:                710 feet (216.4 meters)
  7. Height above original river channel:        638 feet (194.5 meters)
  8. Thickness of dam in bedrock foundation:     300 feet (91.4 meters)
  9. Thickness of dam at crest:             25 feet (7.6 meters)
  10. Length of dam at crest:                1,560 feet (475.5 meters)
  11. Concrete in dam and powerplant:        5,370,000 cubic yards (3,747,083cm)
  12. Cost of dam alone:                    $187 million
  13. Cost of dam, powerplant, and entire project:     $314 million
  14. First storage of water in Lake Powell:         March 13, 1963
  15. Lake Powell reached full pool elevation:     June 22, 1980
  16. Full pool elevation:                3,700 feet
  17. Depth of full pool at dam:             560 feet (170.7 meters)
  18. Elevation of crest of dam:                3,715 feet above sea level (1132.3 m)
  19. Capacity of Lake Powell:                 27,000,000 acre feet
  20. Number of generators in powerplant:        Eight
  21. Initial power generated:                 September 4, 1964
  22. Total generating capacity:             1,320,000 kilowatts